Preparation of building a house


Preparation of building a house, Everyone should aspire and desire to have their own house may be by buying through developer or build your own.

Maybe if you are planning to buy house so through your developer does not have too much trouble with the process as people who want to build their own house, you just come to the location of housing you want, come to the marketing, selecting cluster you want and you're done.

In contrast to the process if you want to build their own house either use the services of architect / contractor and to be themselves.

Well here are a few things needed to build a house to keep things running smoothly, besides of course you have to provide the funds.

1. Choosing the location of the land,

Choosing the location where the house we will build is a job that demands a precision, not only the technical aspects, as well as some other aspects that determines, as the economic aspect, the achievement is also another aspect that could be the basis of selection of the location land where we will build the house later .

Economic Aspects: Maybe the economy is more emphasizes on the value of land in terms of the investment, whether the value of the land and the environment are in line with the price of the building to be in the plan, such as the location of the land is in an area that is less strategic (in the alley, dense residential areas, in suburban areas with difficult access, etc.) will be in Build Homes with a value above $ 500 million, when viewed in the economy, the value of buildings and land values ​​are not in accordance with the principles of economy, certainly if the house will be on sale price will also fall, while construction prices are high, it is because the environmental conditions are not favorable. Therefore it is advisable to choose the location of the land in accordance with the development plan, or if we already have the land to be in a less favorable economically, the development plan must also be adapted to the existing value of the land.

Aspects of Achievement: The reason the choice of location can also be seen from the aspect of this achievement, we usually measure aspects of this achievement with our routine daily activities, such as work, school children, and the achievement of other facilities such as entertainment and commerce. The closer the location where we want to build a house with which we work, children's schools, entertainment and commerce, then the location will be more positive values ​​of the aspect of this achievement, and this will also affect the economic aspects of the course.

2. Finding information on the price of building, architectural models or trend

Once we have the right place where we will build a house, then the next step is to gather information as possible about the house building plans, gather information regarding the price of the current building, look around the building material products, such as a walk in the super market building materials, where we can see the shape and price of building materials. What is important to gather as much information about the house is, see trends emerging architecture today, for example by looking at housing fairs, reading a magazine or tabloid housing, you can also find information via the INTERNET about housing and other way to collect information about house construction.
3. Looking for Architect to help make home design

If we are sick, we seek a doctor to cure us, so we have a damaged car and then we are looking for a mechanic to fix our car. And what we need if we want to build a house? of course we were looking for an architect. Sometimes a lot of people think that what we have to pay an architect, but we want to build a small house, sometimes this kind of thinking often comes to mind a lot of people about how the need for an architect to design house that would make us wake up, which often is " certainly expensive to use the services of an architect to build a house ". These thoughts should we lose, sometimes it gives the architect the solutions we build house plans, architects usually find a good solution in terms of design and also buget plan provided for the construction of the house to match the ability we have. An architect would likely give a clear-elasnya on design and costs to be incurred later, even with the services of our architect work as much as possible to avoid work that would cause waste, disassembly result of planning that less mature earlier, which when compared the services to be paid for an architect even more, not to mention the results of a design that maybe we are not satisfied.

By using the services of an architect, then we can see the final result of the design with the help of sketches the design or because of advances in technology today, we can also see the final result of the design exactly like the original with the help of computer animation.
4. Administering licensing

Once we have a picture of the house building plans, the next stage is the stage where we begin to take care of permits on the house building plans, by taking care of Building Permit (IMB) in government agencies of the village, district to the mayor. The land area is also determining the degree to which we take care of the IMB, to land less than 200 M2 generally IMB fairly administered to district, but if we land area of ​​over 200 m2 arrangements can be up to the mayor.

The following are the requirements that need to take care of IMB (building of Permit):

Copy of ID card applicants
The power of attorney if the signature is not done by the applicant himself
Copy of Proof of ownership of Land Rights passed by the competent authority
Copy of Building Plans Pictures with explanation
Photocopy of the UN settlement (land and building tax) last
Fill out the form that has been provided in the district or the mayor
Permission neighbors for multistory buildings.
5. Process Development Agreement

Process Development Agreement is a process by which we enter a phase where house construction plan will begin, whether done alone or at work by the architect or contractor. Process Development Agreement is obligatory in order to avoid the problems that arise during the building running. If in doing their own, we have a minimum of implementing foreman or worker who will work on the physical building our house, here we have to define the rules and conditions that must be fulfilled, eg hours of work, overtime pay, payment etc..

In contrast, if we use the services of contractors, where all the problems with the craftsman may we never know, what we know is the value of a contract between the assignor and our contractors who carry out the development and implementation schedule. In the process of this Development Agreement should be mentioned article - article clear and detail both in terms of materials to be used, the quality is also a mixture - a mixture of materials etc.. The articles are generally included in the agreement are:

Article 1. Tasks and Working Time
Article 2. Terms and Quality Ingredients
Article 3. Price Contract
Article 4. Payment
Article 5. Addition Works
Article 6. Other
Cover
6. Development Control

Development Control if in doing himself

Supervision of construction on a project in itself would do differently with the project that was done by the contractor. If you do it yourself project in general supervisory oversight hardest workers, if taking a daily payment system, if not properly supervised the project might be delayed from the schedule already determined. If using bulk power system, it is likely because the builders do not pay attention to the quality of the development work to reach targets. Therefore, it is to note that the system will be taken daily or contract personnel, our ability to adjust to the transferor, to what extent we can control the course of the project, if we can give more time, daily payment system can be taken, but if we as task have limited time the entire stock system can also be an alternative power as long as the agreement is made on the quality of the work when it is not able to at unloading at no charge.

Risks above is the most common when the work was done alone with the help of builders directly without using the services of a contractor, as well as risks - risks such as the outcome is not appropriate due to lack of supervision, etc..